March 28, 2008 Various interior and exterior shots
March 19, 2008 Removing trees; more 2nd floor work
March 18, 2008 2nd floor beams; drain diggers
March 14, 2008 2nd floor work
March 12, 2008 Water works
March 07, 2008 More ceiling beams
March 04, 2008 Installing more beams
Feb 25 and 26, 2008 Second floor joists
Feb 17-21, 2008 Prep and install beams for gathering area
Feb 14, 2008 Main entry wall
Feb 13, 2008 More pics of the framing crew
Feb 12, 2008 Interior walls being framed in
Feb 07, 2008 More walls, pt. 2 - time lapse lift
Feb 02, 2008 Sloped wall added
« back
Photos and videos of the JSLC expansion project
Jan. 31, 2008 More walls - panorma photos
Jan. 30, 2008 Three walls are up
Jan. 29, 2008 South wall lift - time lapsed
Jan. 29, 2008 Tower lift
Jan. 26, 2008 Framing started
Jan. 24, 2008 Pouring the concrete floor
Jan. 15, 2008 Digging out for more footings
Jan. 10, 2008 The great "cover up"
Jan. 09, 2008 Install conduit; framing material delivered
Dec. 21, 2007 Pouring the foundation
Nov. 10, 2007 Install footings
Nov. 05, 2007 Removing the parking lot asphalt.
Groundbreaking ceremony Photos courtesy of Glenn Reid
1984 first groundbreaking Slide show